Gas interlocks in commercial kitchens: BS 6173, IGEM/UP/19 and the checks that matter

Why commercial kitchens need a gas and ventilation interlock, the proving methods allowed, the CO₂ levels to work to, and the faults engineers find most often on site.

BLBarnabas Looney3 min read

A gas interlock stops gas reaching the cooking appliances unless the kitchen ventilation is running. Without one, a canopy fan that's switched off or has failed can let carbon dioxide and carbon monoxide build up while burners keep firing. It's one of the most important safety systems in a commercial kitchen, and one of the most frequently bypassed.

Where the requirement comes from

  • BS 6173 covers the installation and maintenance of gas-fired catering appliances. It requires mechanical ventilation in commercial kitchens to be interlocked with the gas supply.
  • IGEM/UP/19 sets out how interlocks and their associated systems should be designed and applied. Edition 2 was published in 2022 and replaced the earlier edition.
  • HSE's catering information sheet on gas safety supports both.

How an interlock proves the ventilation

The interlock needs a signal that the extract (and supply, where fitted) is actually moving air, not just that a switch is on. Common methods are:

Method How it proves ventilation Watch for
Airflow switch Senses air movement in the duct Grease build-up, poor sensor position
Pressure differential Measures pressure across the fan or filters Blocked tubes, wrong set point
Fan current or power monitoring Detects the motor is drawing load A broken belt can leave the motor running
CO₂ monitoring Measures kitchen CO₂ and shuts gas off at a set level Sensor position and calibration

IGEM/UP/19 deals with where CO₂ monitoring is appropriate and how it's combined with other proving methods. The key figures to know:

  • 2,800 ppm CO₂: the level a well-ventilated kitchen should stay below, and the usual pre-alarm point.
  • 5,000 ppm CO₂: the level at which the interlock must shut off the gas.

What to check on a service visit

  1. Prove the shut-off. Turn off the extract and confirm the gas solenoid closes and appliances go out. Do the same for supply air where it's interlocked.
  2. Check the manual reset. After a shutdown, gas shouldn't come back on just because the fan restarts. Someone must reset it deliberately, with appliances off.
  3. Check the solenoid for let-by with the system off.
  4. Measure CO₂ and CO in the kitchen with appliances running and record them.
  5. Check the emergency stop buttons if fitted.
  6. Look at the fan side: belts, bearings and filters. A clogged filter can starve airflow and trip a pressure-proving interlock repeatedly, which is exactly what tempts staff to bypass it.

The faults you'll actually find

Bypassed or overridden interlocks. A jumper in the panel, a switch taped down, a "temporary" link from three years ago. BS 6173 doesn't permit overrides. Treat it under the unsafe situations procedure and explain why to the person in charge.

Nuisance tripping. Usually a symptom: dirty filters, a sensor in the wrong place, slipping belts or a speed controller set too low. Fix the cause, not the interlock.

New appliances on old systems. Adding a gas appliance to an existing kitchen can bring the installation within newer requirements. Assess the whole installation, not just the new unit.

No one knows how to reset it. Leave clear instructions by the panel and show the staff.

Recording it

Your gas safety record should show the interlock type, the result of the proving test, the CO₂ and CO readings, and any defects with the action taken. If you issue an At Risk or Immediately Dangerous notice because of an interlock fault, record that the responsible person was told and signed.

CaterTrackr's gas safety sheet has fields for the gas and extraction interlock, kitchen CO₂ and CO, and the warning notice outcome. The extraction canopy sheet includes the interlock checks too, so the fan side and the gas side are covered on the same visit.

A summary for working engineers. The standards themselves (BS 6173 and IGEM/UP/19) are definitive, and interlock work requires the appropriate competence.

Do your job sheets, F-Gas records and return visits on your phone.

CaterTrackr is job management for catering engineers. 30 days free, no card needed, £35 a person a month after.

BL

Barnabas Looney

Barnabas Looney writes the CaterTrackr blog: practical guides on F-Gas, gas safety, servicing and running a catering equipment firm in the UK.