Return visits and parts on order: stop jobs falling through the cracks
Why second visits are where catering engineering firms lose time, money and customers, and a simple process for capturing, ordering, chasing and booking them.
BLBarnabas Looney3 min read
Ask any catering engineering office where things go wrong and the answer is usually the same: the second visit. The engineer diagnosed the fault, the part wasn't on the van, and somewhere between the job sheet and the supplier's order desk the job went quiet. Three weeks later the customer rings, cross, asking why their fryer still isn't fixed.
Why return visits go missing
- The note "revisit required" is on a paper sheet in a van.
- The part number is in the engineer's head, or on a photo on his phone.
- The office orders the part but nobody tracks when it's due.
- The part arrives at the depot and sits on a shelf because nobody connected it to a job.
- The original job was invoiced and closed, so there's no open job to remind anyone.
Each of those gaps is small. Together they cost you the customer.
A process that works
1. Capture it properly on site
When the engineer can't finish, the job sheet should record:
- Return visit needed: yes. Never left blank.
- Reason: parts to fit, needs a quote, more time needed, needs a specialist, or couldn't get access.
- What's needed next time, in a sentence: "Fit new thermostat and recalibrate, 45 minutes."
- Parts to order: description, part number and quantity for each.
- How the appliance was left: working with a fault noted, or isolated.
2. Turn it into a job straight away
The return visit should exist as its own job the moment the first one is completed, not as a note on an invoiced job. It belongs in the office's list of jobs to book, with the original job linked so the history is one tap away.
3. Track the parts in three steps
Keep it simple: To order → Ordered → Arrived.
- To order: the office sees the parts list with part numbers.
- Ordered: record the supplier and the expected date.
- Arrived: the job is ready to book.
The office should be able to see every return visit waiting on parts on one screen, with the expected date, so chasing a supplier is a two-minute job each morning.
4. Book it and tell the customer
Once the parts are in, book the visit and give the customer a time. A customer who hears "your part arrived this morning, we can be there Thursday" before they have to chase you is a customer who stays.
5. Close the loop on site
On the return visit, the engineer should see the parts ordered for the job and mark each one fitted, so they go on the invoice at the right quantity.
What to measure
First-time fix rate: the share of breakdown jobs completed without a return visit. Track it monthly. If it drops, look at van stock first, because the same few parts usually account for most return visits.
Days from diagnosis to return visit. Supplier lead times you can't control; the days between "arrived" and "booked" you can.
Return visits older than two weeks. These are the ones that turn into complaints.
Van stock is the cheapest fix
Look back over three months of return visits and list the parts. You'll find the same handful again and again: thermostats, door gaskets, fan motors, solenoid valves, igniters, drain pumps. Carrying them costs less than a second trip.
How CaterTrackr does it
In CaterTrackr the engineer switches on "Needs a return visit", picks a reason, adds what's needed and the parts to order. When they finish the job, the return visit is created automatically as a new job, linked to the first. The office sees it on the home screen under "Return visits waiting on parts", moves the parts from To order to Ordered (with supplier and due date) to Arrived, then books it in the diary. On the return visit, the engineer taps "Fitted" next to each part and it goes on the invoice.
Do your job sheets, F-Gas records and return visits on your phone.
CaterTrackr is job management for catering engineers. 30 days free, no card needed, £35 a person a month after.
Barnabas Looney
Barnabas Looney writes the CaterTrackr blog: practical guides on F-Gas, gas safety, servicing and running a catering equipment firm in the UK.